Customization: | Available |
---|---|
After-sales Service: | 24h Online |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Vehicle Name | CLW5250JSQ6SZ | Chassis Mod | EQ1250GL6DJ |
Engine model | YCS06270-60 | Engine power | bndedand |
wheelbase | 4350+13504750+1350 5850+1350,5350+1350 |
Total mass | 25,000 |
emission standar | d GB17691-2018 National VI | curb weight |
17000 16200
|
Vehicle external dim | ensions 11950*2550,2500*3920*3850 | ||
Dongfeng's new T5 driver's cab,Fast nine speed transmission, 5-speed front axle 10 ton dual rear axle,11.00R20 steel tires, remote throttle with power take-off,airbag seats,air conditioning, Chassis configuration daytime running lights,multifunctional steering wheel,300MM through three-layer beam,central control,remote control(four lock in one) |
|||
Haiwo 12 ton 5-section arm crane,with a maximum lifting capacity of
12000KG,360'continuous rotation,lifting height of 22meters,operatingradius of 18.1 meters,composite front support legs,greatly improving the safety of the whole vehicle lifting.The oil oylinder of the whole machine Top configuration adopts Haiwo original pure aocessories to ensure the reliablity of the hydraulic system.The two section arm has a single output function,and the double pole oil cylinder telescopic mechanism is installed inside the boom,with stronger lifting capacity.The crane adopts high-precision full proportional control valve,with sensitive load and good micro motion |
|||
Container configurtion | Made with cold rveting toichnology.it is more durable and can be made in variou shope5 00ording to the announoed standardn |
||
Leg configuration | Haiwo original factory rear support leg |
Precautions and maintenance of on-board crane 1, Lifting precautions 1. Secure loose pipe joints and fasteners; Check all components, especially structural parts, for any damage. If there is any damage, please contact our company as soon as possible Contact the authorized dealer of the company or our company for proper repair; Ensure that the transmission handle of the vehicle is in neutral and the handbrake is in the braking position; defend Ensure that the oil level in the hydraulic oil tank is not lower than the specified position. 2. Before working in the cold season, the vehicle engine and crane hydraulic system should be fully preheated. After attaching the power take-off, the oil pump should be positioned in the vehicle Quickly lower the air load for more than 2 minutes, and the number of empty load cycles for each action of the crane should not be less than 1. 3. No work is allowed near harsh weather and high-voltage lines; When working at night, the work site should have sufficient lighting to ensure that the work is carried out The safety. 4. Lifting operations should not be carried out on slopes or uneven ground. When working on soft ground, the support legs of the crane should be cushioned with pads Wood and other materials are used to increase the pressure bearing area. 5. Before starting the homework, extend the movable legs horizontally and try to maintain the horizontal state of the crane as much as possible; The ground support height of the vertical oil cylinder should be supported by the feet It is advisable to extend the rear of the vehicle by about 60mm, and the front wheels of the vehicle should not be lifted off the ground; After lifting heavy objects off the ground, use the boom with caution to extend the load or use Lower heavy objects with variable amplitude oil to prevent danger caused by increased lifting torque. 6. Overloading and illegal operations are not allowed. Especially when the working radius is greater than 4 meters, special attention should be paid, such as estimating that the load is close to the corresponding amplitude The maximum value, please refer to the following simple lifting method to check the safety of the operation. Observe the ground clearance of the support foot on the opposite side of the lifting arm direction: micro lifting When the object leaves the ground and its legs are attached to the ground, it indicates good stability; If the height of the support foot above the ground does not exceed 60mm, it indicates that the lifting torque is approaching the stable limit, At this time, caution should be exercised when working; If the height of the support foot above the ground exceeds 60mm and continues to increase, it indicates that the lifting torque has exceeded the stability limit and should be immediately applied Put down heavy objects, adjust the lifting weight or operating radius before continuing the operation. 7. Do not drag heavy objects, and do not rashly lift or remove objects buried underground, placed in mud and water, or frozen at the bottom and ground. 8. During the operation, the boom should rotate slowly from the direction of the vehicle on both sides to prevent instability due to torque overload; No one is allowed in the homework Who enters the working radius. No one is allowed to stand under the crane arm; During homework, the operator should concentrate and not leave the operating position without permission; In the homework, The number of turns of the steel wire rope wound on the drum shall not be less than 5, and special attention should be paid when conducting underground operations; During homework, the multi way valve should be operated smoothly to avoid being too fast Start and stop quickly to prevent equipment damage or danger to personnel. 9. When the ambient temperature is too high or the continuous operation time is too long, attention should be paid to observing the oil temperature. The oil temperature should not exceed 80 ºC, otherwise it should be stopped Work or take measures to trap temperature, and restart work after the oil temperature drops to a normal state; Do not adjust the pressure of each safety valve without authorization; 10. After the homework is completed, all parts of the crane should be restored to the driving state in a timely manner: the leg positioning pin should be firmly inserted (when the positioning pin is set), and the crane arm should be in the cargo position Above the compartment, the hook is securely fixed and the power take-off operation switch is in the disengaged position. 2, Crane maintenance and upkeep 1. The running in of a new crane is very important. The first 100 hours of use is the running in period, during which the lifting torque should generally not exceed the maximum rated value 80% of the lifting torque. After the break in period, promptly respond to requests for maintenance of various components, cleaning or replacing oil filters, and filtering or replacing hydraulic oil. 2. The reliability of hydraulic transmission and the service life of hydraulic components are closely related to the cleanliness of the system, so the maintenance of the hydraulic system is reliable and reliable More stringent requirements. When disassembling and inspecting the hydraulic system, it is necessary to ensure that all parts that have been explored are cleaned, inspected, and confirmed to be in good condition before assembly Afterwards, dry or cool dry with a silk cloth. It is strictly prohibited to use cotton swabs to scrub the joint surfaces of the disassembled parts. Seals at pipe joints or fixed seals, preferably Disassemble and replace. When assembling the oil cylinder, a special protective sheath is required to prevent damage to the sealing ring. 3. As the usage time of the crane increases, the natural decrease of lubricating oil and the influence of high temperature factors will directly affect its hole sliding performance The operator should receive the lubrication specified in this manual, as it may have adverse effects on the operational performance of the crane and extend the lifespan of its components Content: Regularly replace and replenish lubricating oil. |